Tag: design process

  • What Does an Interior Designer Do Between the Mood Board and Move-In?

    What Does an Interior Designer Do Between the Mood Board and Move-In?

    Ten days into a bathroom renovation, the tile setter calls with a question nobody thought to ask: should the shower niche line up with the grout joint or with the valve? A small detail, and one you will see every morning for the next twenty years. Ask what does an interior designer do once the mood boards are finished, and that phone call is a fair answer. A good designer has already decided the niche, drawn it, and is there to confirm it when the question comes up.

    Most people picture the visible part of the job: color, furniture, fabric, the finished photograph. On a renovation, those choices sit on top of a much larger body of work that happens on paper and on site, and each piece of it produces something you can hold, review and sign off on at a specific point in the project.

    It starts with a conversation, not a sketch

    Before anything is drawn, a designer needs to understand how you live. Who cooks, and how often at the same time? Where do coats and bags land when you walk in? Which rooms feel wrong now, and is it the layout, the light or the storage?

    At Threshold Design Lab, this listening stage shapes everything that follows. Your voice guides the project, and the brief is written around the way you use your home, not around a style label. A thorough brief also defines the scope: which rooms, which walls might move, what stays and what goes. Scope is the first of many interior designer responsibilities, because every later drawing and budget line depends on it.

    The space plan: deciding where everything goes

    A space plan is a measured floor plan showing walls, openings, built-ins, furniture and the routes people take through the room. On it, the designer works out whether the island fits with stools on one side, whether the door swing collides with the vanity, and whether the dining table can seat eight without anyone backing into a wall.

    For a drawing that looks so plain, the space plan carries a lot of weight. Changes are easy and inexpensive on paper. The same change after framing involves demolition, rescheduled trades and new materials. Many of a renovation’s expensive mistakes are caught, cheaply, at this stage.

    Elevations: what you will see standing in the room

    Where a plan looks down on the room, an elevation faces one wall at eye level, the way you will experience it. Elevations set cabinet heights, the alignment of a hood with the range below, the reveal between a countertop and a window sill, the placement of sconces relative to a mirror.

    Elevations are where proportion gets resolved. They also expose conflicts the plan cannot show, like an upper cabinet that would collide with existing window trim. Tradespeople build from these drawings, so their precision directly shapes the finished room.

    Selections and the itemized budget

    With layout and elevations settled, the designer selects materials and products: flooring, tile, stone, plumbing fittings, lighting, hardware, paint, cabinetry finishes, and furnishings where they are part of the scope. Each selection is specified with the detail a supplier or installer needs, such as size, finish, quantity and any installation requirements.

    Those selections feed an itemized budget. Itemized is the important word. A lump-sum total tells you very little, while a line-by-line budget shows exactly where your money is going and lets you make informed tradeoffs: a simpler tile in the laundry room to afford the stone you love in the kitchen, for example. The budget stays tied to the selections, so it moves when they move.

    Ordering and coordination: the phase most people never see

    Once you approve the design, someone has to buy everything, in the right order, from the right sources, and make sure it arrives when the trades need it. This is procurement, and it is one of the least visible but most valuable services interior designers offer.

    Lead times drive the sequence. Custom cabinetry, special-order fixtures and some lighting can take far longer than the installation itself, so they are ordered first. The designer tracks each order, coordinates with vendors and subcontractors, and keeps the schedule realistic. If a product is discontinued or delayed, the designer finds an alternative that holds the design together, so the choice never falls to whoever happens to be on site that day.

    Curious which of these deliverables your own project calls for? Our first consultation costs nothing. Request a time with our designers, in person or by video, and we will sketch out how the work would be staged for your rooms.

    On site: where design meets construction

    During construction, the designer’s job shifts from drawing to protecting what was drawn. That means site visits, answering technical questions from the trades, reviewing work as it progresses and resolving the inevitable surprises that come with opening walls in an older home.

    Firms differ most at this stage, and the line between design and execution shows up plainly. In some arrangements, the designer hands over the drawings and steps back, visiting occasionally. In a design-build model, the same team carries the project through installation. At Threshold Design Lab, the studio handles project management itself, coordinating licensed plumbers and electricians and keeping the build aligned with the plan, so the person who answers your call about a tile delay is the one who drew the elevation that tile belongs to. Questions that would otherwise travel between three parties get answered in one conversation, and because the people who drew the room also understand how it is built, a site problem often turns into a better detail, such as storage tucked into a wall cavity the demolition uncovered.

    That continuity is the core idea behind full-service interior design: one team responsible from first sketch to final walkthrough.

    Where design ends and execution begins

    It helps to think of a renovation in three phases, because it clarifies how interior designers work and where their role changes.

    Design and planning produces the space plans, elevations, material selections and itemized budget. The designer leads, and you make the decisions.

    Procurement and curation turns approved selections into orders, a schedule and a coordinated set of vendors and subcontractors. The designer manages, and you are kept informed.

    Execution and installation is the build. In a full-service model, the designer or project manager oversees the work, resolves technical questions and guides the project to completion. In a design-only model, a separate contractor takes responsibility here, and the designer’s involvement is usually limited to observation.

    Knowing which model you are signing up for avoids misunderstandings later. If you assume the designer is managing the site and they assume the contractor is, decisions fall through the gap. You can see how our studio structures this on our residential interior design and remodeling services page.

    What you should expect to receive

    A useful way to evaluate any designer is to ask what you will physically hold at the end of the design phase. For a renovation, that typically includes a measured space plan, elevations of the key walls, a schedule of selections with specifications, and an itemized budget. On larger projects, it may also include lighting plans and millwork drawings.

    Ask to see examples from completed work. Our project gallery shows finished rooms, and the documents behind those rooms are what made them possible. The story of our studio explains the background in design, remodeling and millwork that shapes how we document a project.

    The short version

    On a renovation, an interior designer listens, plans, documents, budgets, orders, coordinates and oversees. The finished look gets the photographs, but it only holds up because of the plans, the purchasing and the problem-solving on site that nobody photographs.

    Planning a renovation and hoping one team can carry it from the first measured plan to the last installed fixture? Get in touch with Threshold Design Lab or call the studio at (773) 433-0042, and tell us which rooms are on your list.

    Frequently Asked Questions

    Do interior designers handle permits?

    Permit requirements depend on the scope and the building, so they are discussed and handled case by case. Ask any designer at the outset who will own that conversation. On a design-build project it usually sits with project management, which keeps the homeowner from relaying questions between the building, the city and the trades.

    Can I hire an interior designer for just one room?

    Yes. A single kitchen, bath or living room can be a complete project, and the same deliverables apply at a smaller scale: a plan, elevations where walls are being built or changed, selections and a budget.

    How involved do I need to be during the project?

    Expect to be most involved during design, when you are making decisions about layout and materials. Once selections are approved, a full-service designer carries most of the coordination, and your role becomes reviewing progress and answering occasional questions.

    Does an interior designer replace a contractor?

    In a design-only arrangement, no; you still hire a builder separately. In a design-build arrangement, the firm manages construction directly, using licensed trades for plumbing and electrical work.

    What is the difference between an interior designer and a project manager?

    The designer decides what the space should be and documents it. The project manager makes sure it gets built that way, on schedule, by coordinating trades and deliveries. In a full-service studio, the two roles work side by side on every project.

  • How to Work with an Interior Designer: Your Role from Brief to Installation

    How to Work with an Interior Designer: Your Role from Brief to Installation

    A whole-home project tends to stall at a predictable point. You have photos, a rough budget, and a strong sense that the rooms are wrong. Then you are asked whether the dining room should stay formal, or which wall the bookcases belong on. Those questions are hard to answer alone, and an early wrong answer shapes every decision after it.

    Learning how to work with an interior designer comes down to your role at each phase: you bring a clear brief, you make decisions on time, and you approve plans, budgets, and changes in writing. The designer listens, plans, coordinates, and protects what you decided. Your part is smaller than doing the design yourself, but the project depends on it.

    The phases below follow a typical project, from the brief through installation. At each stage, you will see what to expect from an interior designer and which drawings and documents land on your desk. You will also see the moments where a slow decision costs more than the decision itself.

    What Should You Prepare Before the First Meeting?

    Before the first meeting, write down three things: what has to change, how much you plan to spend, and who will make the final decisions. You do not need a design yet. A designer can work from a clear problem. A vague wish is much harder to turn into a plan.

    Define What Needs to Change and What Must Stay

    Start with what fails in the space today. “There is nowhere to put coats and bags when we walk in” helps a designer more than “I want more storage.” The first statement names a daily problem. The second only names a feature.

    Then list what has to stay. Your list might include:

    • Load-bearing walls, plumbing stacks, or a window you cannot move.
    • Appliances or equipment you bought recently and plan to keep.
    • Furniture, lighting, or art that carries meaning or value.
    • Original details in an older home, such as trim, transoms, or built-ins.

    Fixed items limit the layout, so they belong in the brief from day one. A kept dining table sets the clearance the room needs around it. A piano sets the wall it can live on. If you name these early, you avoid paying for a plan that ignores them.

    Gather Inspiration Without Trying to Design the Room Yourself

    A mood board is most useful as evidence of what draws you in. Collect 15 to 30 images from magazines, saved online photos, or rooms you have stood in. Then write one line under each about what caught your eye: the warm wood, the hidden storage, the low hanging pendant.

    Patterns appear quickly. If eight images show flat-panel doors and stone that runs up the wall, the designer has a starting direction. If your images conflict, that is useful too, and the designer will ask which direction wins.

    Hold off on selecting exact tiles or faucets. Picking finishes before the layout exists pushes the plan to fit a product. The better order is to settle the space first and the finishes second.

    Discuss Scope, Budget, Fees, and Decision-Makers

    Interior designer cost has two parts: the fee for the design work and the cost of the project itself. Fees come in several forms, including hourly rates, flat fees by phase, a percentage of the project, or a markup on purchased items. Ask which method the designer uses and what it covers.

    Share your real budget range. A designer can only plan within a number they know. A budget set too low leads to a plan you cannot build, and a padded one hides choices you might have liked.

    Decide who signs off before you sit down. If two people share the home, settle your common ground first. Approvals that get reversed at home break schedules faster than almost anything else in an interior design project.

    What Happens During the Initial Consultation?

    The initial consultation is where the designer learns how your space has to work and you learn how they will run the job. Treat it as a working session. Both of you should leave with a clear picture of scope, deliverables, and who does what.

    Explain How You Use the Space, Not Just How You Want It to Look

    Describe a normal week. Who works from home, and where? Do the kids do homework at the dining table or in their rooms? Do guests stay over, and how often? These facts decide which rooms need doors, where storage goes, and how many outlets each room needs.

    Mention the habits you would rather hide too. If mail and chargers pile up on the console by the door, the plan needs a drop zone there. A good designer asks follow-up questions at this stage and builds the plan from your answers, not from a style board.

    Ask What the Designer Will Deliver and Who Will Manage the Work

    Ask for a list of deliverables by phase. You should expect space plans, elevations, material selections, and an itemized budget. Ask whether they will also produce 3D renderings, lighting plans, or shop drawings for custom pieces.

    Then ask about project management. Some designers hand you a plan and step away. A full service interior designer orders products, schedules trades, and oversees installation, which is what full-service interior design means in practice. Ask who calls the contractor when a cabinet arrives damaged. That one answer tells you how much of the coordination will land on you.

    For a home, a firm’s residential interior design scope should list these phases plainly. For a workplace or retail space, ask how commercial interior design differs in scope and approvals.

    Agree on Communication, Approvals, and Next Steps

    Settle the mechanics before design starts. Agree on these points:

    1. One main channel for updates, such as email or a shared project portal.
    2. How often you will get status updates.
    3. How approvals are recorded, ideally in writing.
    4. How changes are priced and approved before work moves forward.

    Written approvals protect both sides. When a selection is signed off, everyone knows which version gets ordered. Close the meeting by confirming the next step, the next date, and what you owe the designer before then.

    How Do You Participate in Design and Planning?

    During design development, you review and approve drawings in a set order: layout first, built details second, finishes and budget last. Each approval becomes the base for the next stage, which is why the order matters more than the speed.

    Review Space Plans Before Choosing Finishes

    The space plan is a top-down drawing that shows walls, built-ins, furniture, and the paths between them. Read it like a map of your day. Trace your route from the front door to the kitchen, from the bedroom to the bath. Check where two people will pass each other.

    Look for clearances, door swings, and where a sofa back faces an entry. Ask which way the desk faces in the home office and whether the screen will catch window glare. Space planning decides these things, and finishes cannot fix a layout that blocks traffic.

    Comment freely at this stage. Moving a wall of bookcases on paper costs a little drawing time. Moving it after the shop has built it costs far more.

    Use Elevations and Visuals to Resolve Built Details

    Elevations are flat, straight-on drawings of each wall. They show cabinet heights, drawer sizes, shelf spacing, and where hardware lands. They also show how a built-in meets the ceiling, which is a detail many clients first notice once it has been built.

    This is where custom millwork gets defined. Elevations set the panel style, the reveal between doors, and whether the television sits behind matching panels. If the same team designs and builds the custom millwork, the drawing you approve is the one the shop cuts from. That is the main argument for a design and build firm.

    3D renderings help you see color, light, and proportion together. Treat them as a check on mood and scale, and use the elevations for exact dimensions.

    Approve Materials, Furniture, Lighting, and the Itemized Budget

    Material selection works best with real samples in the actual room. View stone, wood, fabric, and paint under your own daylight and at night. A rug that looks warm in a showroom can turn gray under north light.

    Lighting design needs its own review. A lighting plan shows each fixture, the switch that controls it, and the layers it creates: ambient light for the room, task light where you read or work, and accent light on art or shelves. Make sure switches sit where you enter.

    Furniture selection follows the plan, with sizes checked against the drawn clearances. The itemized budget ties all of it together, line by line. If the total runs high, choose which lines to trade. Keeping the custom library wall and choosing a simpler dining chair is a clear, reviewable decision.

    What Is Your Role During Procurement?

    In procurement, your job is to confirm every selection before it is ordered and to answer quickly when something changes. The designer handles orders, vendors, and lead times. Your speed and consistency protect the schedule.

    Confirm Selections Before Orders Are Placed

    Before orders go out, you will see a final list or purchase approval. Check model numbers, finishes, sizes, and quantities. A brushed brass faucet and a polished brass faucet can share one product name and still look different side by side.

    Many custom and special-order items cannot be returned. That makes this review the last low-cost moment to change your mind. Ask for a deposit schedule as well, so you know when payments come due.

    Review the Schedule, Lead Times, and Any Proposed Substitutions

    The project schedule shows when each item should arrive and when each trade works. Lead times drive it. Upholstery, custom millwork, stone, and special-order lighting often set the pace for the whole project.

    Sometimes an item is discontinued or delayed. A good designer brings you a substitution with its trade-offs explained: color, size, price, and timing. Review it against the elevations. A slightly deeper sofa, for example, can eat the walkway the plan depended on.

    Answer substitution requests quickly. An unanswered email about one fixture can hold up the electrician’s visit.

    Keep Purchases Within the Agreed Process

    Buying items on your own during procurement creates gaps no one is tracking. A light fixture you order directly may need a different junction box. A rug you buy may not fit the drawn clearance.

    If you find something you love, send it to the designer first. They can check fit, timing, and cost before you commit, and fold it into the plan instead of working around it.

    What Should You Expect During Installation?

    During installation, the designer or project lead runs the site while you stay informed and available for decisions. Expect several trades to overlap, a few surprises behind the walls, and a final walkthrough before the job closes.

    Know Who Coordinates Trades and Resolves Technical Questions

    Confirm one point person for the site. That person sequences demolition, rough plumbing and electrical, drywall, built-ins, finishes, and final trim. Each step depends on the one before it. Stone cannot be measured until the cabinets below it are set and level.

    Technical questions come up daily. Where exactly does the sconce box go? Does the new duct clear the joist? The point person answers these against the drawings. Send your own questions to that person too, so trades do not get conflicting instructions.

    When the designer’s team also builds the millwork, a field question about a panel or filler goes straight to the people who made it. That shortens the path between a problem and its fix.

    How to Work with an Interior Designer When Site Conditions Change

    Older buildings hide things. Opening a wall can reveal an uneven floor, a pipe in the wrong place, or framing that does not match the old plans. Chicago greystones and bungalows are known for surprises of this kind.

    When a condition changes, expect the designer to explain the problem, offer options, and show the cost and schedule effect of each. Your role is to choose. Ask how each fix affects the finished look. Boxing out a pipe, for instance, can shift a built-in or change a shelf depth.

    Decide quickly, but not hastily. A short pause to choose the right fix beats a rushed choice that shows for years.

    Walk Through the Finished Space and Document Remaining Items

    At the end, walk every room with your designer. Open every drawer and door. Test every switch, dimmer, and appliance. Look at seams, caulk lines, and paint touch-ups in daylight.

    Record anything unfinished or flawed on a written punch list with photos. Each item should have an owner and a target date. Ask for care instructions for stone, wood finishes, and fabrics, plus warranties and manuals. Keep the final drawings too, since they help with future repairs.

    A Clear Brief Makes Room for Better Design

    Knowing how to work with an interior designer is mostly knowing when your input matters most. It matters most at the start, in the brief: what is broken, what stays, what you will spend, and who decides. A clear brief lets the designer spend their skill on solving problems instead of guessing at what you meant.

    After that, your job is timing. Big choices are cheap while they live in drawings and expensive once they live in orders and on site. The interior design consultation process exists to pull your big decisions forward, to the point where changing your mind costs an afternoon instead of a month.

    Whether the project is one room or the whole house, Threshold Design Lab, an interior design studio in Chicago, begins every project by listening. Start with your list of what is broken and what has to stay: it is the most useful thing you can hand any designer.

    Frequently Asked Questions

    When should you bring an interior designer into a remodel?

    Bring a designer in before you hire a contractor or order cabinets and furniture. Early involvement lets the layout, lighting, and storage get planned together, while walls and wiring can still move.

    Can a designer incorporate furniture you already own?

    Yes, and those pieces belong in the first brief, with photos and measurements. The designer plans clearances and finishes around them. A kept piece might be refinished, reupholstered, or set into a new built-in.

    Does an interior designer coordinate with your contractor?

    Most full-service designers do, and it is worth confirming during the consultation. They share drawings, answer field questions, and check that the work matches the plans. Firms that also build custom millwork can coordinate more closely, because the shop and the designer work from one set of drawings.

    Who approves a replacement if a selected material is unavailable?

    The client does, in writing, after the designer presents options. The designer should explain how the replacement differs in look, size, cost, and timing, and check it against the elevations before anything is ordered.

    What happens if you change your mind after approving a design?

    A change is still possible. It goes through the change process agreed at the start, with its cost and schedule impact shown before work continues. Changes made before ordering cost the least; changes after fabrication can mean remaking a piece.